In the discussion about previous 4 concepts in the last blog, we considered the strict constraints of them, which is the interaction between users and wall interrupted easily by passerby. Therefore, we decided to update our group concepts. Our new concepts are applied in the ceiling and floor rather than the wall. There are three…
Category: Uncategorized
Idea concept (Demi)- Team 10
Play with the sound and colors. The third concept is a basic installation with 10-15 programmable light bars. It’s like an instrument with different notes of the scale and color. This installation is mainly used at the front of door which is all around the eave and controlled by programming. The users can release emotion…
Weekly Report 5 —- team 7
Hello~ I’m Lingxi Zhou from team 7, and this is our group report for this week.
Team 7 – Weekly Report 3
Team members: Lingxi Zhou(lzho0299), Jiaxin Lin (jili9029), Weilai Xu(wexu6630)
Team 15 – Weekly Report 2
Team members: Yuling Xu, Jingni Xue, Zhiliang Xie Sites Selection Site 1: The corridor on level 3 Affordance – Students walk into or out of the study room, moving slowly across the corridor. They are attracted possibly by some interesting installation and have time to explore and experience. Constraint – The corridor is in front…