Weekly report 07 (Team 06)

This week, we mainly focus on our final design concept and planning for the following weeks.  First of all, we have a list of problems should be resolve: The permission for closing the lights of the site. Test the usability of our home projector, if it is not suited for use in our project, we…

Blog: Scenario Team 08

As a group of three, we conducted scenario to test problems of our design concept before we start coding. After prototype is made, we will post another scenario walking through blog for testing. During it, two of us were acting as two personas (non-expert performance/audience, and dancer). Based on scenario test, here are the results…

Team 15 – Weekly Report 7

In the last week, we have confirmed the main interactive process. We found that the most difficult things are how to attract users to actively participate in the interaction and make them enjoy it. These are closely related to the lighting effects presented to the users in our project. Thus, this week we did two…

Weekly Report #7: Design progress & the technical stuff (team03)

Achievements (Week 8): Mapped out the movement scenario based on our finalised concept  Checked out the projector from the asset office and have worked on visual projection Sourced different materials  Sourced different sound bites for the “installation experience” Final Concept With the help and guidance from Louis and Ruchi, we are more clear with our…

Week 9 – Weekly report 7(Team 09)

This is Ye Xu on behalf of Team 09 presenting you this week’s weekly report. The following items would be addressed in this report. Our final concept Possible interactions Possible obstacles Next Step We decided to go with the concept of playful masks.  There are two possible interactions for now. Sincere our site can be…

Weekly Report 8 – Team 7

Hi, I am Weilai Xu from team 7, this week we finally e finally settled on our final design concepts. I wish we could not change it.