Team 15 – Weekly Report 2

Team members: Yuling Xu, Jingni Xue, Zhiliang Xie Sites Selection Site 1:  The corridor on level 3 Affordance – Students walk into or out of the study room, moving slowly across the corridor. They are attracted possibly by some interesting installation and have time to explore and experience. Constraint – The corridor is in front…

Team 13 Weekly Report 2

Team Members: Youya, Iris, Faping This week we chose installation site, observed and analyzed this site condition by using mapping space through workshop on Friday. Our installation site is at the level 2 Hearth (Nears window), Wilkinson Building. On Sunday (25 August), we visited museum and tried to get some inspiration from exist interactive artwork. We…

Design Process: Exploring Public Spaces(team03)

//Stage: Discovery// At the early stage of the project, we were given the design brief of designing an interactive artwork with elements of ritual, play or performance at the Wilkinson building. Within this framework, the location is the key and only solid element for us to start with. With the opportunity of the “Body as…

Weekly Report #2: Project Plan (team03)

Team #03 – Weekly Report #01 Edit by: Ally Lam (hlam3117) Achievement (week #3): Form the team Site exploration and confirmation Created the team charter Decided on the theme (Play) Developed Overall project plan Resources allocation Project timeline Overall Project Plan  Stage Tasks Time Discovery Exploring space User observation & research Questionnaire / Interview  Decide…

Weekly report 2 Team #10

Team 10 Right Turn Members: Jill, Demi, Serena This week we decided our site and did some research. Place: Back courtyard People get in or out of the building either through the main entrance route or through the bicycle route. First of all, the number of people using this entrance is lower than those using…

Site Selection- Team 1 Weekly Report

Our primary progress this week was in the area of site selection. During the mapping spaces workshop, we identified three key areas of interest: An alcove at the entrance to the lecture theatre on level 2 The front section of the foyer on level 1 The stairs from level 1 to level 2 While the…

Physical Site Conditions

This week we finalised our team charter, confirmed our installation site, distributed tasks, and studied our physical site conditions. Our allocated installation space is the balcony attached to the Masters Home-base, on level 2 of the Wilkinson building. Since the planned installation will occur at night, we went back to see the space in the…